"EllaLink station installation is almost done"
03.08.2020
João Nuno Ferreira, General Coordinator of the FCCN Unit, visited the Sines station, which will house the EllaLink submarine cable, and revealed some details about the structure.
03.08.2020
03.08.2020
24.07.2020
20.07.2020
17.07.2020
15.07.2020
25.06.2020
23.06.2020
23.06.2020
22.06.2020
09.06.2020
02.06.2020